When a planned activity is carried out, the possibilities of damages and expenditures inherent to it are alleviated, which is not different in the case of transformers.

As examples, scheduled shutdown events can be cited for performing power transformer replacements and / or shifts. In such cases, planning allows all the handling and transportation of the transforming units involved in the replacements and relocations to be made in a more safe and economical way, which results in lower costs and risks of material damages and accidents with workers.                rubber gates

When it comes to an unscheduled stop, two situations may occur. The first refers to corrective intervention for fault or fault correction without the need for transformer replacement. The second occurs when the transformer is faulty or defective and must be replaced by a backup unit.